<?xml version="1.0" encoding="utf-8" standalone="yes"?><rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom"><channel><title>ascotdrive on Somerset Daily</title><link>https://somersetdaily.co.uk/tags/ascotdrive/</link><description>Recent content in ascotdrive on Somerset Daily</description><generator>Hugo -- gohugo.io</generator><language>en-us</language><lastBuildDate>Mon, 27 Apr 2026 15:29:01 +0000</lastBuildDate><atom:link href="https://somersetdaily.co.uk/tags/ascotdrive/index.xml" rel="self" type="application/rss+xml"/><item><title>Months of Disruption Expected as New Toucan Crossing Construction Begins in Bridgwater</title><link>https://somersetdaily.co.uk/months-of-disruption-expected-as-new-toucan-crossing-construction-begins-in-bridgwater/</link><pubDate>Mon, 27 Apr 2026 15:29:01 +0000</pubDate><guid>https://somersetdaily.co.uk/months-of-disruption-expected-as-new-toucan-crossing-construction-begins-in-bridgwater/</guid><description>Construction has begun on a new pedestrian and cyclist crossing over Ascot Drive, a busy connector road in north-east Bridgwater, prompting warnings of up to two months of traffic disruption for motorists.
Ascot Drive serves as a critical route linking the A38 Bristol Road to residential areas including the Westminster Walk estate by Persimmon Homes Severn Valley and the Evergreen Parade estate, currently under development by Bloor Homes South West. This road crosses the Bristol to Exeter railway line and functions as a major commuter artery to both Bridgwater town centre and the M5 motorway via the Dunball roundabout.</description></item></channel></rss>